This summer has gone by fast, I think it was because it started out so slow. The weather was cold until mid to late June and now that its time for me to get some things done before winter sets in....
After nearly two years, I finally won the battle with my builder over my garage floor. They are going to replace the slabs in the double car side and install "Push Piers".
This weekend I had to move everything over into the single stall side, including emptying the Lista cabinets and moving them over two feet from the staircase wall.
Today they came in and broke up the slabs.
Thankfully I got the clutch replaced in the truck a few weeks ago, I still need to winterize it and replace the shocks though.
Monday, October 6, 2014
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment